REALMS Origin / Development diary
Grounding the Archive approach.
Six stepped retaining foundations around the Archive’s eastern portal. A fresh look at the documented r161 construction, its actual game views and the work still ahead.

Follow the shape of the ground.
The Archive’s eastern approach includes a straight, a bend and a descending section. The r161 work adds six connected stepped retaining foundations around the existing enclosure, fitting their bases to the terrain.
This is a local exterior construction milestone. It retains the existing walls, passage floors and underground cavity; it does not establish completion of the portal complex or region.

Check the model where it will be used.
The authored geometry and collision were installed in an isolated game candidate. The documented checks passed 270 affected walking legs and 464 scoped checks.
The images here are actual native diagnostic inspection views. Unfinished grey neighbouring structures, terrain transitions and vegetation overlap remain visible. These views do not establish final gameplay presentation or performance.
What remains connected to this work.
The separate entrance gallery, remaining portal and plinth contacts, regional approaches, guards and junctions still need work. Irrigation, drainage, planting and material transitions also remain part of the exterior programme.
Broader traversal, unresolved inherited contacts, Save/Continue and release qualification remain open. The normal launcher was not promoted to this candidate, and no public playtest or release date is announced.
A character standard for the same world.
Alongside the environment, the JAL character study is developing a recognisable face and a reusable standard for anatomy, hair, clothing and animation. The intended finish applies to both existing explorers as well as JAL.
The finished character likeness is still being built. Concept artwork, model studies and the retained playable prototype are shown as separate stages.
