Skip to content

Independent. Perth, Australia.

← Journal

REALMS Origin / Development diary

Inside the Workshop.

A look inside the r63 development build: rebuilt western supports, walking checks and saved progress. Work completed on 10 November, shared with gameplay, concept art and model views.

Third-person gameplay view along the unfinished Workshop terrace, with the player holding a wrench.
Actual r63 gameplay capture / 10 November 2026. Environment, character and visual finish remain in development.

Build the connections, then walk them.

The latest Workshop development batch replaced five previous western support functions with four connected assemblies, retaining the existing deck positions and walking levels. The work focuses on how the approach meets its supports and foundations.

The changed western section was checked by walking across it in both directions with the ordinary player controller. The scoped walking checks passed in the isolated development build.

The intended appearance.

The concept study explores limestone, bronze details and darker foundations for the support assemblies. It guides the appearance; measured model geometry determines the dimensions and connections.

This AI-generated study is a design reference. The current game materials and finish do not yet match it, and visual acceptance remains open.

AI concept sheet showing four limestone support assemblies with bronze bands and dark foundations.
AI-generated appearance concept / Design direction, not a game screenshot.

From the study to editable geometry.

The corresponding 3D model contains four support assemblies, including a shared corner and three fitted setbacks. Source-model and installed-geometry checks passed for this batch.

The model view below shows the authored geometry. It is a separate asset render, rather than a gameplay camera.

Render of the four actual support models, with pale masonry, bronze bands and dark bases.
Actual 3D model render / Workshop western connections, r63. Materials and finish in development.

Continue where you left off.

The isolated Save/Continue checks retained the player’s existing skills, contributions and repaired water state. A separate fresh-process Continue check also passed.

That establishes persistence for this tested candidate and save. It does not establish compatibility with every save or completion of the wider game.

Elevated in-engine inspection view of Workshop pavilions, watercourt and connecting routes.
Actual r63 in-engine overview / Inspection camera, 10 November 2026. Unfinished surrounding geometry remains visible.

What remains to build.

The eastern connections, remaining pale fragments, terrain seams, pavilion work and interiors are still open. Resident-route validation and wider performance and release checks also remain ahead.

Workshop is not complete. This is an internal development candidate, not a public release; the ordinary game launcher was not promoted to this build. These images and checks document the work completed on 10 November, rather than a new playtest on the publication date.